For The Guys

Hi Everyone,

I thought I’d give you all an update on how things are going over at Wholistic Fitness. Things are going well (as well as things can possibly go for a large project). Dust is flying over here! Floorplan, HVAC, sprinklers, insulation, framing, drywall, electrical work, paint, and prepping for the floor install has kept us all on our toes the last month or so.  We’ve hit some road bumps along the way, last week was particularly challenging but as my friends and construction crew remind me, things could always be worse :)- With “worse” in mind, I am grateful for all the hardworking men that have been putting in long, tiring hours (with no A.C up until today) to build a center for women. So, this post is for the guys! See our facebook page for more pics and videos :) 

http://www.facebook.com/WholisticFitness#!/WholisticFitness

This entry was posted in Uncategorized. Bookmark the permalink.

Comments are closed.